The LADBS NEC Standard Electrical Load Calculation form serves as a critical tool for determining the appropriate electrical load for both residential and commercial buildings. This ensures that electrical systems are designed with safety and efficiency in mind. Being a key component in electrical planning, it adheres to the guidelines specified by the National Electrical Code (NEC).

Open Editor Here
Table of Contents

Navigating the intricacies of electrical load calculations is a critical step for any construction or renovation project, ensuring that electrical systems are not only efficient but also safe. Central to this process within the jurisdiction of Los Angeles is the LADBS NEC Standard Electrical Load Calculation form, a comprehensive tool that guides individuals and professionals through the necessary calculations to determine the correct electrical load for a building. This form, aligned with the National Electrical Code (NEC), encompasses various aspects of a project, from the basic layout of the electrical system to more complex considerations such as heating and cooling loads, appliance demands, and the specifics of lighting requirements. It serves as a valuable resource for ensuring that electrical installations meet the stringent standards set forth by the NEC, thereby facilitating the approval process by the Los Angeles Department of Building and Safety (LADBS). With its structured approach, the form aids in the meticulous planning required for both new constructions and modifications to existing structures, ensuring that all electrical installations are designed with precision, adhere to code, and ultimately contribute to the creation of safe, reliable, and efficient electrical systems.

LADBS NEC Standard Electrical Load Calculation Example

NEC Standard Electrical Load Calculation for Single Family Dwellings

(Only for Service Ratings of 120/240V, 225 Amps Max)

 

 

Owner:

 

 

 

 

Location:

 

 

 

 

 

 

 

Total Floor Area of Dwelling (NEC 220.12)

 

 

 

 

 

 

 

 

 

SQFT.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Factor

 

 

 

 

 

 

 

 

Quantity

 

 

Volt Amperes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“General Lighting”

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

General Lighting (SQFT X 3 VA/SQ FT (Table 220.12)

3 X

sqft.

 

 

 

2.

Small Appliance Circuits (1500 VA per circuit)

(NEC

1500 X

 

 

 

 

 

220.52(A)) (minimum 2)

 

 

 

 

 

 

 

 

 

 

 

3.

Laundry Circuit (1500 VA per circuit) (NEC 220.52(B))

1500 X

 

 

 

 

4.

Total General Lighting Load (Add lines 1, 2 & 3):

 

 

 

 

 

 

 

 

5.

First 3000 VA @ 100%:

 

 

 

 

 

 

 

 

 

3000

6.

Total General Lighting Load – 3000 =

 

 

@ 35%=

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.

Net General Lighting Load (Per NEC 220.42) (Add lines 5 & 6):

 

 

 

 

 

 

 

 

 

 

 

 

*Fixed Appliances(if insufficient space, use back):

 

 

YES

NO

 

 

 

Garbage Disposal

 

 

 

 

 

 

 

 

 

 

 

 

 

Bathroom Fan

 

 

 

 

 

 

 

 

 

 

 

 

 

Microwave

 

 

 

 

 

 

 

 

 

 

 

 

 

Dishwasher

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

8.

3 or less Appliances,

Total Appliance VA;

 

 

 

 

 

 

 

 

 

 

 

 

4 or more Appliances,

75% of Total Appliance VA (NEC 220.53):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Other Loads (including motors, EV charger(s), etc.)

 

 

YES

NO

 

Nameplate Rating

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9. Electric

Range (8000VA or Nameplate)**

 

 

 

 

 

 

 

 

 

 

 

10. HVAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11.

Electric

Oven

 

 

 

 

 

 

 

 

 

 

 

 

 

12.

Electric

Dryer (5000 VA minimum)**

 

 

 

 

 

 

 

 

 

 

 

13.

Electric

Vehicle Charger

 

 

 

 

 

 

 

 

 

 

14.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16.

25% of largest motor (NEC 430.24)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Service Load Volt-Amperes (VA) (Add lines 7, 8 & 9 thru 16) =

 

 

 

 

Total Service Load Volt-Amperes / 240-volts =

 

 

Amperes

 

 

 

 

***Service Rating (Amperes)=

*For every “YES” answer, indicate VA rating of equipment

**Nameplate rating must be used if larger

***Service Rating shall be greater than or equal to the Service load

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on t he basis of disability and, upon request will provide reasonable accommodation to ensure equal access to its programs, services and activities.

NEC Standard Electrical Load Calculation (Rev. 03-23-2016)

www.ladbs.org

File Overview

Fact Name Description
Form Purpose The Los Angeles Department of Building and Safety (LADBS) NEC Standard Electrical Load Calculation form is used to calculate electrical load requirements for residential and commercial buildings in compliance with the National Electrical Code (NEC).
Governing Law The form adheres to the NEC, which is part of the National Fire Protection Association (NFPA) 70 codes and standards. Local amendments by the City of Los Angeles also apply.
Applicability It is applicable to all new constructions, renovations, and additions where electrical installations or modifications are intended within the City of Los Angeles.
Sections Included The form includes sections for general information, calculated loads, existing loads (for additions or modifications), and total load summary.
Form Submission Applicants must submit the completed form to the LADBS for review and approval as part of the electrical permit application process.
User Accessibility Available for download on the LADBS website, ensuring accessibility for individuals and professionals preparing for construction or electrical work.
Importance of Accuracy Accurate completion is necessary to ensure electrical systems are sized appropriately for safety, efficiency, and compliance with legal requirements.
Penalties for Non-compliance Failure to comply with the NEC and local amendments can result in fines, delays in construction, or the necessity to redo non-compliant work at the owner's expense.

LADBS NEC Standard Electrical Load Calculation - Usage Guidelines

Before beginning to fill out the LADBS (Los Angeles Department of Building and Safety) NEC (National Electrical Code) Standard Electrical Load Calculation form, it's important to gather all the necessary information. This document is used to determine the electrical load of a building or structure to ensure that the electrical system is properly sized. Accurate completion of this form is crucial for safety compliance and to prevent overloading the electrical system. Make sure you have detailed information about the property, including square footage, appliance ratings, and specifics about heating, cooling, and lighting systems.

  1. Start by entering the address of the property and the date on the top of the form.
  2. Input the owner’s or applicant's name and contact information, including the phone number and email address.
  3. Describe the property's use or occupancy type in the designated area, such as residential, commercial, or industrial.
  4. Enter the total area in square feet of the property to calculate the general lighting and receptacle loads.
  5. Fill in the specifics of all fixed appliances, including type, quantity, and electrical ratings. This includes equipment such as ranges, ovens, and dryers.
  6. For heating and cooling systems, provide the total rating in kilowatts (kW) or British Thermal Units (BTUs).
  7. Input data for motors and other loads, detailing the horsepower (HP) rating or kilowatt consumption of each system.
  8. Calculate the total load by adding up all individual loads and input this total in the specified section.
  9. Determine if any deductions are applicable, such as for motor load diversity, and subtract these from the total load. Enter the deducted total.
  10. Sign and date the form to certify the accuracy of the information provided. If you are not the property owner, ensure the owner or an authorized agent’s signature is also present.
  11. Double-check all entries for accuracy before submitting the form to LADBS for review and approval.

Completing the LADBS NEC Standard Electrical Load Calculation form with precision is essential for ensuring the electrical system's efficiency and safety. By carefully following these steps and consulting with an electrical professional if uncertainties arise, you contribute to the successful processing of your form. Always check the LADBS website for any updates to the form or submission process. Submitting a correctly filled form helps expedite the review process, allowing your project to proceed without unnecessary delays.

Your Questions, Answered

What is the LADBS NEC Standard Electrical Load Calculation form used for?

This form is designed for calculating the standard electrical load in a building or property according to the National Electrical Code (NEC) requirements. It helps in determining the minimum size of the electrical service needed to power a building safely and efficiently. This calculation is crucial for ensuring that the electrical system is neither overloaded nor underutilized.

Where can I find the LADBS NEC Standard Electrical Load Calculation form?

The form is available on the Los Angeles Department of Building and Safety (LADBS) website. You can download it directly from their Electrical Engineering section. It's always a good idea to make sure you have the latest version by checking their website for any updates.

Who needs to complete the LADBS NEC Standard Electrical Load Calculation form?

Typically, electrical contractors or engineers who are planning or modifying electrical systems within a building need to complete this form. However, homeowners doing substantial work on their property's electrical system might also need to use it if they are required to obtain a permit for the work.

How often should the calculation be done?

Calculation should be done whenever there's a significant change to the electrical load of a building. This includes renovations, additions, or any changes in usage that would affect the electrical demand. It's also necessary when installing a new electrical service or upgrading an existing one.

What information do I need to provide in the form?

You'll need to provide detailed information about the property, including but not limited to total square footage, types of appliances and fixtures, heating and cooling systems, and any special equipment. The form guides you through various categories of electrical loads and calculations based on the NEC guidelines.

Is assistance available for completing the form?

Yes. If you're unfamiliar with some of the terminology or calculations, LADBS offers guidance through their customer support or in person at their offices. Licensed electricians or electrical engineers can also provide valuable assistance in ensuring the form is filled out correctly.

What happens after I submit the form?

Once the form is submitted, it will be reviewed by LADBS for compliance with the NEC and local regulations. You might receive feedback or requests for additional information. Approval of this form is essential before any work commences, as it forms part of the permit process.

Can I submit the form electronically?

Yes, LADBS allows for electronic submission of forms, including the Electrical Load Calculation form. This method is often faster and more convenient for both the applicant and the reviewing officials.

What mistakes should I avoid when completing the form?

Common mistakes include underestimating or overestimating the load, omitting required information, or not following the NEC guidelines accurately. Double-check your calculations and make sure all sections are completed thoroughly. Incorrect or incomplete forms can delay the review process and the start of your project.

Common mistakes

Filling out the LADBS NEC Standard Electrical Load Calculation form is a critical step for many when it comes to ensuring that electrical systems are both efficient and up to code. However, it’s easy to make mistakes if you're not careful. Here are nine common errors that are often spotted on these forms:

  1. Not Reviewing Instructions: Skipping the form's guidelines is a common mistake. These instructions are designed to help filers understand each section's requirements, leading to fewer errors and omissions.

  2. Incorrectly Calculating Square Footage: The total area of the living space must be accurately calculated. Errors in this section can lead to miscalculations in required load capacities.

  3. Overlooking Small Appliances: Often, individuals forget to account for the electrical load of small appliances. Every electrical device adds to the total load, and neglecting these can result in underestimating the required electrical capacity.

  4. Misidentifying Room Usage: Mislabeling rooms can affect the calculation, as different spaces have different load requirements. For example, kitchens and laundry rooms typically need more power than bedrooms.

  5. Incorrect Allocation for HVAC Systems: Heating, Ventilation, and Air Conditioning (HVAC) systems are major components of the electrical load. Incorrectly estimating their requirements can either lead to an oversized system or one that fails to meet demands.

  6. Overlooking the Total Number of Electrical Circuits: Each circuit contributes to the cumulative electrical load. Missing any circuit can result in an underestimation of the total load, leading to potential overloads.

  7. Failing to Consider Future Needs: Electrical needs may increase over time. Failing to account for potential additions or modifications can result in a system that's unable to accommodate future requirements.

  8. Mixing Up Units of Measurement: Confusing units of measurement, such as watts with kilowatts, can significantly impact the calculations. Accuracy in these details is crucial for the validity of the entire calculation.

  9. Rushing Through the Form: Taking the time to carefully review and verify each entry before submission is essential. Rushed calculations are prone to errors, which can lead to rejections or the need for revisions.

To sidestep these mistakes, it's recommended to thoroughly review the form and its instructions, take your time, and double-check your work. When in doubt, consulting with a professional can provide additional assurance that your electrical load calculations are accurate and comply with all applicable standards and codes.

Documents used along the form

When planning electrical installations or renovations, contractors and electricians are often required to submit forms and documents to ensure compliance with local building codes and safety regulations. One key document is the LADBS NEC Standard Electrical Load Calculation form, an essential tool for determining the correct electrical load requirements of a building. Alongside this critical document, several others are frequently used to provide a comprehensive view of the project's electrical system design and compliance status. These documents play a crucial role in facilitating approvals, inspections, and ensuring the electrical system's safety and reliability.

  • Electrical Permit Application: This form initiates the review process by local authorities. It includes details about the project, such as location, owner information, contractor details, and the scope of electrical work to be performed. The form serves as a formal request for permission to start electrical installations or modifications.
  • Panel Schedule: This document accompanies the load calculation form and provides a detailed account of the electrical panel's layout, including each circuit and its respective load. It's vital for planning circuit allocations, ensuring balanced loads across circuits, and facilitating future maintenance or upgrades.
  • One-Line Electrical Diagram: This schematic represents the electrical system's layout within the building and is crucial for understanding the overall electrical design. It shows major components of the system, including panels, feeders, and major equipment, and their interconnections, providing a clear overview for inspection purposes.
  • Energy Calculation Worksheet: Although not always required, this document is becoming increasingly important in projects emphasizing energy efficiency. It calculates the energy consumption of the building's electrical system, taking into account all lighting, appliances, and mechanical systems. This worksheet supports efforts to meet or exceed energy code requirements.

Together with the LADBS NEC Standard Electrical Load Calculation form, these documents form a comprehensive package that ensures electrical systems are designed, installed, and maintained according to the highest standards. Submitting these documents as part of the electrical planning process not only aids in obtaining necessary permits and approvals but also contributes to the overall safety, efficiency, and sustainability of building projects.

Similar forms

  • Residential Building Permit Application: This form is used when applying for a permit to construct or modify a residential building. Like the LADBS NEC Standard Electrical Load Calculation form, it requires detailed information about the construction project, including dimensions, materials, and the types of electrical systems to be installed, ensuring compliance with local building codes.

  • Commercial Building Permit Application: Similar to its residential counterpart, this document is necessary for commercial construction or renovations. It demands comprehensive details about the project's scope, including electrical load calculations, to guarantee that the building's electrical system adheres to safety and code standards.

  • MEP (Mechanical, Electrical, and Plumbing) Plan: An MEP plan outlines the mechanical, electrical, and plumbing systems of a building. Like the electrical load calculation form, it plays a crucial role in ensuring these systems are designed correctly for safety and efficiency, especially the electrical component that must meet specific load requirements.

  • Fire Safety Plan: This document outlines a building's fire safety features, including alarm systems, extinguishing equipment, and escape routes. While its focus is on fire safety, it resembles the NEC Standard Electrical Load Calculation form by requiring details about the electrical system to ensure it does not pose a fire hazard.

  • HVAC Load Calculation Form: This form is used to determine the heating and cooling requirements of a building. Similar to the electrical load calculation, it ensures that the HVAC system is appropriate for the building's size and usage, highlighting the importance of proper system sizing for efficiency and safety.

  • Electrical Permit Application: Required when installing or modifying electrical systems, this application parallels the NEC Standard Electrical Load Calculation form in its requirement for detailed electrical system information, affirming that all work will comply with national and local electrical codes.

  • Plumbing Permit Application: While focusing on plumbing rather than electrical systems, this document shares the need for detailed project specifications and compliance with local building codes, similar to how electrical load calculations ensure electrical system safety and adequacy.

  • Foundation Plan: A foundation plan provides a detailed view of a building’s foundation, including dimensions and construction materials. Although it focuses on a different aspect of construction, like the electrical load calculation form, it is essential for ensuring the structure's safety and compliance with building codes.

  • Site Plan: This comprehensive diagram offers a bird’s-eye view of a property, including buildings, landscaping, and utilities. It is akin to the electrical load calculation form by necessitating attention to detail and compliance with local zoning and building codes to ensure every aspect of the property is properly planned and executed.

  • Energy Compliance Documents: These documents verify that a building's design meets specific energy efficiency standards. Similar to the NEC Standard Electrical Load Calculation form, they require detailed information about the building’s energy use, including electrical systems, to ensure environmental sustainability and adherence to energy codes.

Dos and Don'ts

When dealing with the LADBS NEC Standard Electrical Load Calculation form, it's essential to pay close attention to details to ensure accuracy and compliance with local regulations. Here are some do's and don'ts that can help guide you through the process.

Do:

  1. Read the instructions carefully before starting. Understanding the guidelines will make the process smoother.
  2. Use black ink when filling out the form to ensure legibility.
  3. Verify all calculations multiple times to eliminate errors.
  4. Include all required sections for a comprehensive overview of your electrical load needs.
  5. Utilize the most current form version to make sure your submission is accepted.
  6. Ask a professional if you're unsure about any part of the form. It's better to get help than to make an error.
  7. Make a copy of the completed form for your records.
  8. Ensure your contact information is up-to-date and accurate in case the department needs to reach you.
  9. Submit the form before the deadline to avoid any processing delays.
  10. Review the entire form one last time before submission to catch any overlooked mistakes.

Don't:

  1. Don't rush through the form. Take your time to fill it out correctly.
  2. Avoid guessing; if unsure about a section, seek clarification.
  3. Don't use pencil or colors other than black ink as they may not be legible or accepted.
  4. Don't leave any sections blank unless specifically instructed. If a section does not apply, mark it as "N/A".
  5. Don't alter the form's layout or structure. Use it as provided.
  6. Avoid submitting the form without checking the current guidelines and requirements. These can change, and you need to be up to date.
  7. Don't forget to sign and date the form. An unsigned form may be considered incomplete.
  8. Avoid submitting incomplete forms. Be thorough and provide all requested information.
  9. Don't ignore the local codes and requirements that may affect your electrical load calculation.
  10. Don't hesitate to contact LADBS for help if you encounter any problems with the form.

Misconceptions

The Los Angeles Department of Building and Safety (LADBS) NEC Standard Electrical Load Calculation form is an essential document for ensuring that electrical installations comply with the National Electrical Code (NEC) standards. However, there are several misconceptions surrounding its use and importance. Let's address and clarify some of these common misunderstandings.

  • It's only necessary for large projects. Many believe this form is only required for extensive or commercial projects. In reality, it's crucial for any project where electrical systems need to comply with NEC standards, regardless of size.
  • You need to be an electrician to complete it. While it helps to have electrical knowledge, the form is designed to be understandable for professionals across various fields with some guidance or research.
  • It's optional. This misconception might stem from varying requirements across different jurisdictions. However, in areas governed by the LADBS, submitting this form is mandatory for projects that involve electrical work, ensuring that systems are safe and efficient.
  • It only calculates total power usage. Beyond calculating the total power usage, the form assesses the distribution of electrical load, helping to identify the need for specialized circuits or potential overloads.
  • Using the latest form is not necessary. Standards and codes can change. Using the most recent version of the form ensures compliance with the latest NEC standards and local amendments.
  • The form is too complicated to be useful. While detailed, the form is structured to guide the user through the necessary steps to ensure accurate load calculations. It aims to make the process transparent and comprehensive.
  • Submitting the form guarantees approval of the electrical design. Submission is just one step in the approval process. The design must meet all applicable codes and standards, and further revisions may be required upon review.
  • Corrections are not allowed after submission. Corrections and adjustments are a normal part of the review process. If issues are identified, one can usually submit revised calculations for approval.
  • Only new constructions require it. Renovations, additions, or any changes that affect the electrical system can also necessitate a load calculation to ensure safety and compliance.
  • It solely benefits the LADBS. While it aids the LADBS in enforcing codes, the primary benefit of this form is to the property owner and occupants. It ensures that electrical installations are safe, efficient, and suitable for the property's requirements.

Understanding the purpose and requirements of the LADBS NEC Standard Electrical Load Calculation form is pivotal in ensuring electrical safety and compliance with NEC standards. Dispelling these misconceptions helps streamline the approval process while enhancing the overall safety and efficiency of electrical installations.

Key takeaways

Filling out the LADBS NEC Standard Electrical Load Calculation form is a crucial step in ensuring that electrical systems in buildings are both safe and adequately powered. This documentation, required for various construction and renovation projects within Los Angeles, must be completed with care. Below are five essential takeaways to consider when dealing with this form:

  • Understand the Purpose: The form is designed to calculate the standard electrical load of a building accurately. This is vital in determining the appropriate size for the electrical service entrance, ensuring that the system can handle the load safely and efficiently.
  • Gather Necessary Information Beforehand: Before filling out the form, it is important to collect all the necessary data. This includes, but is not limited to, the total square footage of the building, the types of appliances and machinery that will be used, and their respective power requirements. Having this information at hand will make the process smoother and more accurate.
  • Be Precise: Accuracy is key when completing the electrical load calculation form. Overestimating can lead to unnecessary costs in installing an oversized electrical system, while underestimating can pose significant safety risks. Ensure all measurements and calculations are double-checked.
  • Know the Codes: The form is based on guidelines from the National Electrical Code (NEC). Familiarity with the NEC is crucial, as it provides the standards for the safe installation of electrical wiring and equipment. The NEC is updated every three years, so make sure to refer to the most current version applicable to your project.
  • Seek Professional Guidance: If there’s uncertainty at any point, don’t hesitate to consult with a licensed electrician or electrical engineer. Professionals can provide valuable insights and ensure that the form is filled out correctly, which can save time, money, and prevent potential issues with compliance down the line.

Approaching the LADBS NEC Standard Electrical Load Calculation with these key points in mind will help streamline the process, ensuring compliance with local regulations and contributing to the safety and efficiency of the building’s electrical system.